- That Draft Plan of Subdivision approval be given to the Draft Plan prepared by Kirk L. Stidwill, O.L.S., dated February 17th, 2021 on Part of Lot 8, and Part of the east half of Lot 9, Concession 3, comprising of 14.41 ha (35.6 acres) of land. The proposed Draft Plan will afford a total of 8 Phases of Development which will accommodate 127 single detached lots, 39 small lot singles, and 24 semi detached lots. The proposed Draft Plan and municipal road dedication are subject to the fulfilment of the Draft Plan Conditions, as shown in Appendix A, (Refer to Attachment 1), and associated rezoning coming into effect.
- That the lands located on Part of Lot 8 and Part of the east half of Lot 9, Concession 3, also referred to as the Northwoods Forest Subdivision Phases 3 – 10 (total of 14.4 ha (35.6 acres); be rezoned from Residential 20 with a Hold (RES 20 (H) to Residential 10 (RES 10) and Residential 15 (RES 15) with Exceptions. The following site-specific exceptions will apply:
i) A rear yard setback of 8 metres in Phase 5 (Lot 36)
ii) A rear yard setback of 9 metres in Phase 8 (Lots 1-5 and 18-20)
iii) For an increase in percentage of Small Lot Singles from 25% to 27% in Phase 6, which equates to 8 lots. (see Map - Attachment 2).